Projects

Projects

Featured Projects

Turnkey construction of a multi-building educational facility. The scope encompassed structural concrete frames, high-end architectural finishing, complete MEP systems installation including HVAC and fire fighting, and external works.

Rawabi bladna_page-0011
Rawabi bladna_page-0010
Rawabi bladna_page-0009
1771663661617-feb07626-2cf7-42cc-9d21-cc1c87e333d0_10
Rawabi bladna_page-0008
Rawabi bladna_page-0007 (1)

RESOURCES

HEAVY MACHINERY

FLEET ASSETS

  • Excavators 05
  • Wheel Loaders 03
  • Backhoe Loaders 04
  • Dump Trucks 10
  • Graders 02
  • Rollers 04

FEATURED

HOUSING SECTOR

Athan Bin Malik Educational Complex

Location: Jeddah Year: 2020 Scope: Structural, finishing, MEP, external works

Explore More

Al Jazeera Paints Factory

Location: Sudair Year: 2024 Scope: Steel structure, industrial flooring, fire systems

Explore More

Trojena Accommodation

Location: NEOM Units: 200+ HSE Record: Zero LTI

Explore More

Full Project List Table

Construction of a large-scale industrial warehouse and production facility. Work included heavy-duty industrial flooring, steel structure erection, installation of fire fighting networks, and specialized industrial electromechanical systems.

SCOPE OF WORK

Turnkey construction of a multi-building educational facility. The scope encompassed structural concrete frames, high-end architectural finishing, complete MEP systems installation including HVAC and fire fighting, and external works.

Get Daily News with Us!

However venture pursuit he am mr cordial. Forming musical am hearing studied be luckily. Ourselves for determine attending how led gentleman sincerity. Valley afford uneasy joy she thrown though bed set.

You have been successfully Subscribed! Ops! Something went wrong, please try again.

Projects

Building Works List 

PROJECT NAMELOCATIONYEARSCOPE
Atban Bin Malik Educational ComplexJeddah2019–2020Civil, finishing, MEP
Elementary School Waziriya KandaraJeddah2019Civil, finishing, MEP
Al Maabool Educational ComplexJizan2019Structural, MEP
Ala Kaifak Trading Company FacilityDammam2020Finishing, MEP
Rabwah Medical CenterRiyadh2020Finishing, MEP
VENAN Housing MEP WorksJeddah2021–2022MEP
Coca-Cola Company FacilityJeddah2022Finishing, MEP
NESAJ Town, Al-Ahsa ProjectAl-Ahsa2023Structural, civil
Al Jazeera Paints FactoriesKhamis Mushait, Sudair2023–2024Structural, steel, MEP, finishing
Trojena Phase 1 AccommodationNEOM2022Structural, civil
AMAALA Workers AccommodationAMAALA2022Structural, civil
Qiddiya ProjectsRiyadh2023Structural, civil
Trojena Phase 2 AccommodationNEOM2024Structural, civil
LUMI Tabouk Workshop BranchTabouk2024Structural, MEP, finishing
NWC Data Center – ALFANARRiyadh2024Structural, MEP, infra, finishing

Projects

INFRASTRUCTURE & INDUSTRIA

PROJECT / CLIENTLOCATIONSCOPE
Paving, Interlock & Kerb Stone Al-Razi Yard SABICJubailPaving, interlock, roads
Earthworks inside PETROKEMYA SABICJubailEarthworks, streets, laydown
Removal of Camps SABIC, SASREF, MARAFIQAl-MotrifaDemolition of camps
Asphalt Works for IKK Group SABICJubailAsphalt and road works
Traffic Signal System (6 Intersections) AL-KHONAIN INT’LJubail 2Install, program, test
Traffic Signal Systems (11 Intersections) AZMEEL / TUMPANEJalmudahInstall, program, test

RESOURCES

LIGHT MACHINERY

SUPPORT EQUIPMENT

  • Excavators 05
  • Wheel Loaders 03
  • Backhoe Loaders 04
  • Dump Trucks 10
  • Graders 02
  • Rollers 04

Gallery

SITE HIGHLIGHTS PHASE 1

Gallery

SITE HIGHLIGHTS PHASE 2

© 2026 RBC – CON All Right Reserved